Full Description
Verdant Residence Maenam introduces a collection of 2-bed pool villas designed within a low-density development of 25 homes, positioned approximately 200 metres from the beach in one of Koh Samui’s more established residential areas. The project combines contemporary architecture with Balinese design elements, set within landscaped surroundings that create a private and contained environment across the development.
Each villa is arranged on a single level, with a built area of 256 sqm set on plots of around 375 sqm. The internal layout is centred around an open-plan living and dining space, connected directly to the outdoor terrace and private pool. Large glass panels are used throughout to bring in natural light and maintain a visual connection with the garden and pool areas, while still allowing for separation between interior and exterior zones.
The two bedrooms are positioned to provide privacy within the layout, both configured with en-suite bathrooms. Interior finishes follow a consistent modern style, with fully equipped kitchens and integrated storage. The covered outdoor area extends the usable living space, allowing for shaded seating and dining next to the pool, supported by landscaped gardens that define the plot boundary.
Verdant Residence Maenam is located within Maenam, an area known for its combination of residential calm and access to daily amenities. Beachfront restaurants, cafes, and local markets are within reach, while Fisherman’s Village is approximately 2 minutes away. Chaweng and the airport can be reached in around 15 minutes, and the international school is located roughly 5 minutes from the development.
The project is structured as a 30-year leasehold with an option to extend for a further 30 years. Villas are delivered fully furnished and ready for occupancy or rental use. The development includes managed services such as concierge support, maintenance, and security systems, designed to support both residential use and ongoing property management. Construction is scheduled in phases, with completion timelines extending through 2027 and 2028 depending on the stage of the project.



































































